Recent Project: Cross River Rail Project in Brisbane
The 10.2km Cross River Rail project in Brisbane is a major undertaking as it builds a second river crossing in the core of the cities rail network.
Early on in the project we were approached with a unique design challenge. The solution required our expert design knowledge of the application to re-engineer our Heavy Duty Slipjoint (HDSJ) to incorporate fireproofing. Something never been done before.
Throughout the project we’ve supplied Heavy Duty Slipjoint (HDSJ), Pot bearings, and Rubber Bearing Strips working with multiple stakeholders in the Unity Alliance as they deliver The Rail, Integration and Systems package or works.
Despite COVID-19 disruptions and international supply chain challenges, our project management and design capabilities enabled us to deliver on this large scale infrastructure project.
Recent News
Granor is a proud sponsor of the 2025 NZSEE
Granor is proud to sponsor the 2025 NZSEE Annual Technical Conference in Auckland from 8–10 April 2025, supporting industry collaboration on seismic resilience and sustainable design.
Read moreGranor attends the 12th Australian Small Bridges Conference
We’re excited to attend and proud to be sponsors of the 12th Small Bridges Conference next week!
Read more
Be sure to visit us at Booth 5 at the Gold Coast Convention and Exhibition Centre on October 22nd and 23rd, 2024.
Proud Sponsors of NZSEE 2024
We’re excited to be in Wellington and sponsoring the NZSEE 2024. It’s a great opportunity to connect, share knowledge and be part of ‘Raising the Bar with Resilient Design’. At Granor we are committed to Continuous Improvement, by maintaining leading edge product design and engineering.
Read more